The original seven mudas (TIM WOOD) are:
  • Transport (moving products that are not actually required to perform the processing)
  • Inventory (all components, work in process, and finished product not being processed)
  • Motion (people or equipment moving or walking more than is required to perform the processing)
  • Waiting (waiting for the next production step, interruptions of production during shift change)
  • Overproduction (production ahead of demand)
  • Over Processing (resulting from poor tool or product design creating activity)
  • Defects (the effort involved in inspecting for and fixing defects)[18]. Lähde Wikipedia/Lean. (26.9.2017)
 Lean-ajattelussa pyritään vähentämään seitsemää eri hukkaa (wastea): 
1. Transportation (tarpeeton kuljettelu) 
2. Inventory (varaston minimointi) 
3. Motion (turha liikkuminen) 
4. Waiting (turha odottelu) 
5. Overproduction (ylituotanto, aiheuttaa hävikkiä) 
6. Overprocessing (ylilaatu, perfektionismi) 
7. Defects (virheiden välttäminen: tee asiat kerralla kunnolla/oikein) 